Sheep Bleeding Pulley

FUNCTION

After slaughtered on a stand, sheep are hanged from their back foot to the bleeding hook fork or the chain joint. While the bleeding continues all through the elevator, it is transferred to the bleeding line. Sheep remaining hanging at the fork or joint with the weight of the body, are taken to the fixed process hooks by the foot change apparatus at the end of the bleeding line. Released bleeding hooks return back to the slaughtering area automatically by conveyor.

TECHNICAL CHARACTERISTICS

Sheep bleeding pulley is at the capacity of carrying minimum 100 kg weight and produced of specially shaped steel at the size of 10 x 50. Bearing of pulleys are made of fixed rollers, with a ring apparatus at the end of the chain providing the sheep to be held by foot.

www.mefsa.com.tr